·Streamlined the "Automated Banking" operation for more efficiency and higher usage.
·As a project manager prepared the feasibility study, the architectural and construction drawings; selected the equipment and the contractor for the Coca Cola bottling factory in Turkmenistan.
·Undertook the construction, quality control and interior decoration of the 14-floor headquarters building.